Well here ya go. I think it could be greatly improved upon if it were built in during construction. Not in to the stove but in to the house. Via floor heating using the cold water as coolant to make the TEG’s work better. Everything in a loop water out of the floor to the TEG’s for cooling then heated by the stove through the floor for radiant heat and back to the TEG’s to cool them before being reheated in the stove and looping again. Winter is our shortest solar days and additional power would be great!
This reply was modified 2 years, 1 month ago by BiggKidd.